Looks good
5.4.2007 | The Karst region, Slovenia
The truck has been repainted almost two weeks ago and it already passed the first test. Tree-branches didn't damage the varnish. We kept on gluing thermal insulation on the walls, mounting the furniture, making the generator-holder and installing electrical wiring.
Varnishing
19.3.2007 | The Karst region, Slovenia
Well, it's gone. It abandoned Robert's courtyard and left for painter's.
The ramp stands it
1.3.2007 | The Karst region, Slovenia
Although you are receiving this newsletter from Jordan, the things are moving. At the moment the whole interior is being made at carpenter's and will be mounted as soon as I return to Slovenia.
Walls fitted
4.2.2007 | The Karst region, Slovenia
The things are moving. My little house got its walls. And a roof. And AluBoMa windows. And the door. And the garage is finished. We are also about to finish the floor. A cruise control is installed (and it's working!), additional electrical wirinig on the cockpit and chassis is fixed, the ceiling has been refurbished, a reverse-camera installation is done. When I returned from my business journey it didn't stop raining, then it snowed, while the temperatures are rounding freezing point. Despite of these, we've been working hard during the last two weeks of January and I am pleased with the progress.
Truck repainted, construction finished
13.11.2006 | The Karst region, Slovenia
It took a while. But it doesn't mean I gave in. The one responsible for a two and a half month delay was the varnisher in charge for repainting the chassis and the cabin. He exceeded the deadline for 540% and condemned teh expedition to a one year postponement. It was a good lesson for me - I learned nothing moves if I am absent.