BASF-manufactured Styrodur insulation is next to be fixed on the walls with the aid of Sežana-based Mitol, my new sponsor, Mitopur glues. Later on cut-outs for the roof windows will be made, and as soon as this is done and a couple of dry days are forecast, the cabin goes into final painting. What follows is electrical and water-supply network installation, the two 225 Ah TAB batteries connection and testing, and final furniture incorporation.


Still, the six 14.00R20 all-terrain tyres remain a big financial issue in case no sponsor is found.

Stay in touch,

Your Tilen Gabrovšek - Desert Soul